For restoration and buildback contractors

What came out is what goes back. Your estimate should already know that.

Buildback on an insurance job isn’t a remodel. It’s the second half of the same claim.

① We know the problems

  1. Re-scoping from scratch.

    The demo was documented in detail. Then someone re-measures the whole house for the rebuild estimate.

  2. Lost to a GC.

    You’re asked for the rebuild number while you’re still drying. If you can’t give it, someone else will.

  3. Supplements with no trail.

    Hidden damage found mid-rebuild, and nothing connecting it back to the original file.

② What it costs

$93,000

Illustrative: 80 rebuilds a year × $11,600 — the buildback share of a $15,400 average water claim (Triple-I, 2019–2023) after a $3,800 mitigation invoice — × a 10% documentation gap.

③ A better way

How it’s done nowHow it’s done here
Rebuild scoped from a new walkthroughRebuild seeded from what mitigation removed
Two files for one claimOne claim, one file, mitigation through buildback
Supplements argued from memorySupplements tied to the original documentation

④ Your life after

  • The rebuild number while you’re still drying.
  • One file the adjuster already trusts.
  • Supplements with the evidence attached.

⑤ Standards

  • California CSLB licensing
  • Local permitting
  • Remove-and-replace line pairing
  • 10 CCR §2695

⑥ Your product

ClaimTrak

Insurance work, from first call to final payment.

Mitigation and buildback. One claim, one file.

See ClaimTrak →

Mitigation and buildback are one product. One claim, one file.

Buildback on an insurance job isn’t a remodel. It’s the second half of the same claim.